We are delighted to announce Rosti Turkey is due to open a new purpose-built Plastic Injection Molding production facility, including ISO-8 Clean Room, in Silivri at the beginning of 2024.
The 6500 m2 plant will provide Rosti Turkey with additional capacity in line with Rosti Group’s growth strategy, enabling us to offer new injection molding capabilities as well as extend our Clean Room capabilities in Europe, alongside Poland.
The cleanroom area has ISO-8 cleanroom classification certification for food contact packaging and medical device manufacturing, currently with two injection molding machines and three FFS packaging machines and expansion availability.
As a responsible and sustainable injection molding partner, Rosti Turkey has invested in a solar energy system and Silivri has been awarded Green Energy system(I-REC) as well as zero waste certification.

